PROJECTS

A few of our Past & Present Clients include:

Pottinger Gaherty Westower Communications
Greater Vancouver Regional DistrictSeacor Environmental Services
PHH EnvironmentalCleo Canada
Norecol Dames and MooreVanport
TyamBC Rail
Mohawk OilTri Arrow Industrial Recovery
Crescent Beach MarinaCP Rail
Mud Bay DrillingSouthern Rail
BC Hydro ConstructionNext Environmental
BC Hydro (Lower Mainland Trans.)Bel Construction
Powertech Labs CorpBC Gas
Conor Pacific Environmental TechnologiesGolder Associates
City of Surrey - Property Management Dept.
- Engineering
- Public Works
- Parks Dept.
- City of Surrey Fire Department
Corporation of Port CoquitlamKeystone Environmental
Shell CanadaGemco
Tri WasteGalbraith Powerline Contracting Ltd.
Allteck Line Contractors Inc. 

Work Experience Examples:

Client: Powertech Protection
Road/Pad augering for cathodic protection

Client: BC Hydro
Road building / Pad building

Client: Allteck Line Contractors Inc.
Site: Arnott sub station to Tsawwassen
Trico conducted road construction and construction of pad for 100 ton cranes. Reclamation of land to original form established.

Client: Galbraith Powerline Contracting Ltd.
Site: South Surrey - Highway 99 and 32nd/16th Ave to the Douglas Border Crossing
Trico conducted road construction and construction of pads for 100 ton cranes. Reclamation of land to original form as requested.

Client: BCTC (British Columbia Hydro Authority)
Site: Newton, Surrey to Home Depot, South Surrey
Trico provided road construction and pad building for cranes for hydro tower extension work.

Client: Marathon Developments
Site: Waterfront industrial (former shipyard/ railyard)
Trico conducted excavation services for the remediation of over 10,000 tonnes of hydrocarbon and metal contaminated soil on a 100 acre former multi-use industrial property in Vancouver. Trico worked closely with Marathon management and project consultants to develop cost effective remediation activities.

Client: Tri Waste
Site: Waterfront industrial (former shipyard/ foundry/ sawmill)
Trico provided three phases of remediation work in conjunction with the development of a multi-tower residential complex and marina. Trico's fully experienced operators demonstrated excellent efficiency while excavating, sorting and removing a large volume of heavy metal contaminated soil and materials under difficult winter conditions.

Client: RJM Petroleum Contractor
Site: Various Gas Stations
Trico provided equipment and certified operators for underground tank removals and soil remediation. Biocells were built on site.