A FEW OF OUR CLIENTS INCLUDE:
| City of Surrey, Property Management Dept. | Pottinger Gaherty |
| PHH Environmental | Westower Communications |
| Norecol Dames and Moore | Cleo Canada |
| Tyam | Vanport |
| City of Surrey Parks Dept. | BC Rail |
| Mohawk Oil | City of Surrey Fire Department |
| Crescent Beach Marina | Tri Arrow Industrial Recovery |
| Seacor Environmental Services | CP Rail |
| Mud Bay Drilling | City of Surrey Public Works |
| BC Hydro (Lower Mainland Trans.) | Next Environmental |
| Darwin Construction | Bel Construction |
| Vancouver Condo Services | BC Gas |
| Conor Pacific Environmental Technologies | Golder Associates |
| Greater Vancouver Regional District | City of Surrey Engineering |
| Corporation of Port Coquitlam | Keystone Environmental |
| Shell Canada | Gemco |
| Tri Waste | Galbraith Powerline Contracting Ltd. |
| Allteck Line Contractors Inc. | |
Example Work Experience:
Client: Allteck Line Contractors Inc.
Site: Arnott sub station to Tsawwassen
Trico conducted road construction and construction of pad for 100 ton cranes.
Reclamation of land to original form established.
Client: Galbraith Powerline Contracting Ltd.
Site: South Surrey – Highway 99 and 32nd/16th Ave to the Douglas Border Crossing
Trico conducted road construction and construction of pads for 100 ton cranes. Reclamation of land to original form as requested.
Client: BCTC (British Columbia Hydro Authority)
Site: Newton, Surrey to Home Depot, South Surrey
Trico provided road construction and pad building for cranes for hydro tower extension
work.
Client: Marathon Developments
Site: Waterfront industrial (former shipyard/ railyard)
Trico conducted excavation services for the remediation of over 10,000 tonnes of hydrocarbon and metal contaminated soil on a 100 acre former multi-use industrial property in Vancouver. Trico worked closely with Marathon management and project consultants to develop cost effective remediation activities.
Client: Tri Waste
Site: Waterfront industrial (former shipyard/ foundry/ sawmill)
Trico provided three phases of remediation work in conjunction with the development of a multi-tower residential complex and marina. Trico's fully experienced operators demonstrated excellent efficiency while excavating, sorting and removing a large volume of heavy metal contaminated soil and materials under difficult winter conditions.
Client: RJM Petroleum Contractor
Site: Various Gas Stations
Trico provided equipment and certified operators for underground tank removals and soil remediation. Biocells were built on site.
